SMC EliteConnect Wireless Bridge Guía de usuario Pagina 38

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 318
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 37
Bridge Link Planning
3-6
3
Determine if conduits, bracing, or other structures are required for safety or
protection of the cable
For lightning protection at the power injector end of the cable, consider using a
lightning arrestor immediately before the cable enters the building
Grounding
It is important that the wireless bridge, cables, and any supporting structures are
properly grounded. The wireless bridge unit includes a grounding screw for
attaching a ground wire. Be sure that grounding is available and that it meets local
and national electrical codes.
Vista de pagina 37
1 2 ... 33 34 35 36 37 38 39 40 41 42 43 ... 317 318

Comentarios a estos manuales

Sin comentarios